HQ2 — Pineville Buildout

Square Bidness HQ2 in Pineville — electrical upgrades, floor corrections, and recessed lighting work that also trains for future data center buildouts.

Owner: Square Bidness Apparel Use: HQ2 + Tech Lab field training Status: In progress

0. Today — HQ2 Closeout List (Live)

These are today’s HQ2 tasks you’re knocking out before heading to Brady’s Start2Finish site.

Once this card is fully checked off, HQ2 moves from “in work” to “clean and lender-ready” on the Pineville side.

1. Snapshot

2. Electrical — HQ2 Scope

High-level view of what’s been handled and what remains.

Already in motion

Remaining punch list (HQ2)

Detailed device-by-device tracking lives in: /lab/start2finish-progress/ · /lab/start2finish-boxmap/ · /lab/start2finish-walkthrough/

3. LVP Floor Corrections — HQ2

Early LVP installs created splits between kitchen, washroom, and half bath. This phase locks it into one continuous, lender-ready floor.

Problem zones

Fix plan (Pineville HQ2)

Photos you snapped of seams and door dividers will plug straight into the HQ2 section of the lender packet.

4. Recessed Lighting — HQ2

HQ2 is your test lab for recessed cans — proving clean overhead work before bigger labs and data center rows.

Foyer Recessed Row (6 cans)

Future HQ2 recessed zones

For detailed room-by-room recessed notes, you can spin up a dedicated HQ2 recessed map at /lab/hq2-recessed/ when you’re ready.

5. Linked Tools (Tap From Phone)

Everything that backs HQ2 + Start2Finish work is one tap away.

6. Lender Note (Copy/Paste Block)

Drop this into funding packets when HQ2 work is mentioned.

Square Bidness is actively upgrading HQ2 in Pineville — including full interior repaint, replacement of legacy flooring with LVP, targeted subfloor repairs, and systematic electrical upgrades (outlets, switches, and recessed lighting). This work is performed by the owner on-site, with support from Start2Finish Contracting on related projects, and positions HQ2 as both an operational headquarters and a training lab for future data center and infrastructure buildouts.