Square Bidness Install Method
Principles · Process · Presence
1. Philosophy
The Square Bidness Install Method was born out of necessity — building HQ1, HQ2, and Start2Finish projects with
no shortcuts and no wasted motion.
It’s a discipline that blends tech, construction, and brand precision.
- Start clean — workspace prepped, tools staged, floor protected.
- Move with intention — every cut, every device, every wire has a purpose.
- Document everything — photos, notes, breaker maps, plate counts.
- Finish like a brand — level screws, consistent plates, flush fixtures.
2. Sequence (The SB Workflow)
- Measure — snap lines, find center, confirm beams.
- Pre-wire on the ground — harness built before attic entry.
- Cut & clear — precise holes, no guessing.
- Install — device → plate → alignment check.
- Test — neutral, load, ground continuity.
- Photograph — proof for lenders, records, and marketing.
3. Field Rules
- No rushing — one clean pass beats three sloppy ones.
- No unsafe loads — heaters on 20A lanes only.
- No dirty runs — wires organized, boxes clean.
- No untested work — tester must confirm the finish.
- No guessing beams — always probe or pilot.
This is how Square Bidness protects property, reputation, and future infrastructure.
4. Application
The Install Method is active across:
- HQ1 upgrades (recessed lighting, fan, outlets)
- HQ2 electrical & LVP work
- Start2Finish field projects (Brady house)
- Upcoming 40×50 slab data center build