HQ1 — Phase 2 Buildout
Electrical cleanup • recessed lighting • ceiling fan install • wall repairs • paint • breaker mapping • roof patch prep.
Square Bidness HQ1 — Hammond, LA
1. Snapshot — LIVE Status
- ✔ Middle room: 4 recessed cans installed + aligned.
- ✔ Bedroom (sleep room): 44” ceiling fan installed (skipped cans — better long-term move).
- ✔ A/C + heater lanes upgraded to 20A receptacles.
- ✔ All walls repaired, primed, painted clean.
- ✔ Additional 20A outlet installed for heat press lane.
- ✔ All previous outlets tightened + secured.
- ⬜ Breaker mapping scheduled (print sheet below).
- ⬜ Roof patching ready as soon as weather clears.
2. Lighting & Fixtures
Middle Room — Production Room
- ✔ (4) Recessed LED cans fully installed.
- ✔ Centerlines verified via attic measurements.
- ✔ Wall under old A/C unit repaired, primed & painted.
Bedroom (Sleep Room)
- ✔ 44” ceiling fan fully installed.
- ✔ Better airflow + cleaner lender profile than cans.
- ✔ Still can add dimmer or smart switch later.
Hallway & Misc Rooms
- ✔ Existing switches and outlets updated.
- ⬜ Optional: add 1–2 hallway canless later if wanted.
3. Electrical Upgrades
- ✔ All living-room, hallway, kitchen, and bathroom outlets upgraded earlier in the year.
- ✔ (2) new 20A dedicated circuits for heater + equipment.
- ✔ Press machine lane prepared with 20A outlet.
- ✔ All loose boxes secured to framing.
HQ1 was the birthplace of your electrical training — now standardized under the SB Install Method.
4. Walls, Patch, & Paint
- ✔ Hallway patched & repainted.
- ✔ Middle room wall under old A/C patched & finished.
- ✔ Bedroom 2 wall repairs finished.
- ✔ File cabinet painted Dover White (2 coats + base).
5. Roof Patch — Checklist
- ⬜ Hallway leak — verify around vent boot.
- ⬜ Master bathroom leak — check flashing + sealant.
- ⬜ Bring: Henry’s 208R or Black Jack, putty knife, cordless drill, roof screws.
- ⬜ Replace missing shingles if any (1–2 pieces).
- ⬜ Seal all nail heads while you’re up there.
6. Breaker Mapping
Use this sheet when walking breaker-to-room mapping.
HQ1 — BREAKER MAP
Breaker 1 →
Breaker 2 →
Breaker 3 →
Breaker 4 →
Breaker 5 →
Breaker 6 →
Breaker 7 →
Breaker 8 →
Breaker 9 →
Breaker 10 →
Breaker 11 →
Breaker 12 →
Breaker 13 →
Breaker 14 →