Service Entrance — 200A

Coordinate with utility for meter location, clearances, and inspection.

Overhead (Mast)

  • Meter socket (utility-approved)
  • Mast (RMC/EMT per utility), weatherhead, mast clamp
  • Service conductors (SE rated), 200A main panel
  • GEC: #6 Cu to 2 ground rods (6′ apart), acorn clamps
  • Intersystem bonding termination lug
Open Overhead Sheet

Underground

  • Meter pedestal/sidewall socket (utility-approved)
  • Conduit & sweeps for lateral (schedule per utility)
  • Service conductors (URD/USE per specs), 200A main panel
  • GEC: #6 Cu to 2 ground rods (6′ apart), acorn clamps
  • Intersystem bonding termination lug
Open Underground Sheet